Corrections | 60 Quick Luxury Knits


#1 Cable and Eyelet Shawl, page 8

Updated: 03Dec2014


The color number for Venezia Sport peacock blue is #179.


Please note that both sides of this shawl are beautiful. The pattern was written with the side photographed as the WS.


Stitch Glossary


Inc to 5 (Yo, k1, yo, k1, yo) into same st.


Chart 2
Row 1 has an extra stitch at the end of the row. This chart row should read: kfb, [k3, p2], k2, kfb, k1.
Row 2 the last stitch reading from left to right should have the p on RS, k on WS symbol.


Chart 3 the last stitch reading from left to right should have the p on RS, k on WS symbol.

 


 

#4 Mock Cable and Bell Cowl, page 16

Updated: 08Aug2014


Correction is underlined.


Bell Panel
Row 7 P2, k1tbl, [p2, M4, p2, k1tbl] twice, p2.

 


 

#6 Beads and Bobbles Necklace, page 22

Updated: 18Aug2014


Correction is underlined.


Next (faggoting) row With B, k4, * yo, k2tog, k2; rep from * to last 4 sts, k4.

 


 

#12 Wavy Ribbed Hat, page 38

Updated: 03Dec2014


Corrections are underlined.


Wavy Rib Pattern Note: should end "in rnds 7 and 14."
Rnd 14 *K2, p2, k2, p1, drop next st and let unravel down, p1; rep from * around.

 


 

#13 Cabled Wave Scarf, page 40

Updated: 30Apr2015


This scarf was designed by Danielle Chalson.


2nd Column (corrections are underlined)


Scarf
Cast on 64 sts. Knit 3 rows.
Next row (RS) P8, k to last 8 sts, p8.


Row 15 Sl 1, p7, k4, *8-st RC; rep from * to last 12 sts, k4, p8.
Row 16 Rep row 2.


3rd Column (corrections are underlined)


Row 15 Sl 1, p7, k4, *8-st LC; rep from * to last 12 sts, k4, p8.
Row 16 Rep row 2.

 


 

#15 Collared Cape, page 44

Updated: 21Sept2014


Row 1 of the pattern stitch should read:


Row 1 (RS) K2, *[k1-b] twice, k2; rep from * to end.

 


 

#17 Lacy Leaves Snood, page 49

Updated: 03Dec2014


Corrections are underlined.


Materials
2 3½oz/100g hanks

 


 

#20 Mini Cable Collar, page 58

Updated: 08Apr2018


The definition of how to work the 2-st RC and 2-st LC were omitted. Work as follows:


2-st RC K2tog leaving sts on LH needle, k first st again, sl both sts from needle.
2-st LC With RH needle behind LH needle, skip first st and k 2nd st tbl, insert RH needle into backs of both sts, k2tog tbl.

 


 

#22 Lace Kerchief, pages 63-65

Updated: 03Dec2014


Corrections are underlined.


At top of first column:


Next (inc) rows (RS) K to marker, sl marker, yo, knit to marker, yo, sl marker, k to end—2 sts inc'd.


And again towards the bottom of the same column:
Next (inc) rows (RS) K to marker, sl marker, yo, knit to marker, yo, sl marker, k to end—2 sts inc'd.


In 2nd column:
Rep dec row every 8th row 4 times more—36 sts.

 


 

#24 Cabled Headband, pages 69-74

Updated: 03Dec2014


Page 72: Download a corrected Chart 2. [PDF 271KB]


Page 74: Download a corrected Chart 3 and Stitch Key. [PDF 242KB]

 


 

#25 Lace and Cable Shawl, pages 75-77

Updated: 21Sept2014


3 hanks of Venezia Worsted are needed for this project.

 


 

#34 Diamond Lattice Scarf, pages 101 and 102

Updated: 05May2015


Stitch Glossary — page 101


3-st LC should read: Sl 2 sts to cn and hold to front, k1, k2 from cn.


Chart 1 on page 102


Row 8: reading from left to right, the 15th st from the left should be "–" (knit on WS)

 


 

#42 Slouchy Seed Stitch Hat, page 122

Updated: 06Aug2014


Gauge
20 sts and 36 rnds over seed st using size 7 (4.5mm) needle.

 


 

#47 Fair Isle Beret, page 134

Updated: 08Apr2018


Corrections are underlined.


Second column:


Beret
With smaller needle and A, cast on 112 sts. Place marker for beg of rnd and join, being careful not to twist sts.
Next rnd With A, *k2, p2; rep from * around.


Chart 2


Work the S2KP as follows:


Slip the last 2 sts of the rep as if to k2tog, k the first st of the next rep with A, then pass the slipped stitches over—2 sts dec'd. When worked over the last rep of the rnd, remove the old beg of rnd marker to work the S2KP and then place new beg of rnd marker after the S2KP is complete.

 


 

#49 Button Cable Beret, page 142

Updated: 03Dec2014


Correction is underlined.


SHAPE CROWN — 5th line
Next (dec) rnd [P2, S2KP, work to 5 sts before marker, S2KP, p2, sl marker] 10 times—40 sts dec'd.

 


 

#50 Diamonds Shawl, page 146

Updated: 03Dec2014


Download revised Chart 2. [PDF 267KB]

 


 

#55 Buttoned Cable Cowl, page 158

Updated: 03Dec2014


Correction is underlined.


Cable Pattern
Rows 1, 3, 5, 7, 9, 13, 15 and 17 (RS)